Schultz Creek Drainage Improvements, Arizona 2024
The Schultz Creek Drainage Improvements at US Highway 180 CMAR (the Project) is a transformative achievement in flood mitigation for the City of Flagstaff. Built in response to devastating post-wildfire flooding, this project delivered urgently needed infrastructure to protect the West Flagstaff community.
Vero Beach, Florida 2024
The CR 612/8th Street Lateral Canal Bridge project consisted of replacing an existing two-lane bridge over an existing canal, dredging to widen the canal for the new bridge, reconstruction of approaching roadways, and upgrading the storm drainage that flows into the canal.
Cachet Parq Subdivision
Brantford Engineering who is a long-time dedicated customer of Rinker, provided an alternative for the use of Xstream on this project.
Madison Avenue Redevelopment
Kitchener, Ontario, Tackles Water Quality Issues with Urban Retrofit using Stormceptor MAX
Berczy Glen Phase One Subdivision
Niran Construction was awarded the contract for site servicing for this large residential project.
Cooksville Stormwater Pond
A 10’ wide by 60’ long Stormcepter® MAX was installed in the middle of an industrial park.
Keeping Arizona’s interstate open
Transforming Phoenix, Arizona’s I-17 flood-prone cross streets into a safe passage for motorists.