Vero Beach, Florida 2024
The CR 612/8th Street Lateral Canal Bridge project consisted of replacing an existing two-lane bridge over an existing canal, dredging to widen the canal for the new bridge, reconstruction of approaching roadways, and upgrading the storm drainage that flows into the canal.